- Specifications, Description and Operation
- Diagnosis and Testing
- General Procedures
- Removal and Installation
Installation
Engine
Special Tool(s)
Material
All vehicles
Using the Floor Crane and Spreader Bar, align the transaxle to the
engine.
Install the 5 transaxle-to-engine bolts.
Tighten to 48 Nm (35 lb- ...
Specifications, Description and Operation
SPECIFICATIONS
Material
a 50/50 mixture coolant and distilled water.General
Specifications
Torque Specifications
a Refer to the procedure.
b Tighten to 5 Nm (44 lb-in) plus an addi ...
Other materials:
Lighting control
A. Off
B. Parking lamps, instrument panel
lamps, license plate lamps and tail
lamps
C. Headlamps
High Beams
• Push the lever toward the
instrument panel to activate.
• Push the lever toward the
instrument panel again or pull
the lever towards you to
deactivate.
Headlamp Flasher ...
Installation
Engine
Special Tool(s)
Material
Lubricate the torque converter pilot hub with Multi-Purpose Grease.
Remove the Torque Converter Retainer and bolt.
NOTE: Align the torque converter stud marked during removal with
the flexplate.Using the Floor Crane and Spreader Bar, assemble t ...
Exhaust System
SPECIFICATIONS
Torque Specifications
a Refer to the procedure in this section.
DESCRIPTION AND OPERATION
Exhaust System
Component Location
The 2.0L Gasoline Turbocharged Direct Injection (GTDI) exhaust system
consists of:
a one-piece catalytic converter manifold that is mounted to the
tur ...
