- Specifications, Description and Operation
- Diagnosis and Testing
- General Procedures
- Removal and Installation
Instrument Panel and Console
SPECIFICATIONS
Torque Specifications
REMOVAL AND INSTALLATION
Instrument Panel - Exploded View
Instrument Panel Trim Panel and Fasteners
Instrument Panel Finish and Trim Panels
Instrument Panel U ...
Specifications, Description and Operation
SPECIFICATIONS
Material
Torque Specifications
DESCRIPTION AND OPERATION
Handles, Locks, Latches and Entry Systems
Overview
The power lock/unlock feature locks or unlocks the doors upon a customer
r ...
Other materials:
Fuel consumption
Filling the Tank
The advertised capacity is the indicated capacity and the empty reserve
combined. Indicated capacity is the difference in the amount of fuel in a
full tank and a tank when the fuel gauge indicates empty. Empty reserve
is the amount of fuel in the tank after the fuel gauge indica ...
Specifications, Description and Operation
SPECIFICATIONS
Material
a 6F50 transmission.
b 6F55 transmission.
Torque Specifications
a Refer to the procedure in this section.
General Specifications
Solenoid Operation Chart
a Turns on
above 8 km/h (5 mph).
b Turns off above 8 km/h (5 mph).
NC = Normally closed
NH = ...
Removal and Installation
Roof Opening Panel - Exploded View
NOTE: The roof opening panel motor must be initialized when repairs
are carried out on any part of the roof opening panel system, including:
whenever the roof opening panel motor has been removed from the roof opening
panel system, the roof opening panel gl ...
