- Specifications, Description and Operation
- Diagnosis and Testing
- General Procedures
- Removal and Installation
Installation
Engine
Special Tool(s)
Material
All vehicles
Using the Floor Crane and Spreader Bar, align the transaxle to the
engine.
Install the 5 transaxle-to-engine bolts.
Tighten to 48 Nm (35 lb- ...
Specifications, Description and Operation
SPECIFICATIONS
Material
a 50/50 mixture coolant and distilled water.General
Specifications
Torque Specifications
a Refer to the procedure.
b Tighten to 5 Nm (44 lb-in) plus an addi ...
Other materials:
Module Configuration
DESCRIPTION AND OPERATION
Module Configuration
System Operation
Programmable Module Installation (PMI)
Programmable Module Installation (PMI) is a scan tool process which
configures settings in a new module. Data used for the PMI process is
automatically downloaded from the original modu ...
Engine Ignition - 3.7L Ti-VCT
SPECIFICATIONS
Material
General Specifications
Torque Specifications
DESCRIPTION AND OPERATION
Engine Ignition
Component Location
3.7L Ti-VCT
System Operation
REFER to the PC/ED manual
section 1 Description and Operation.
Component Description
REFER to the PC/ED manua ...
General Procedures
Timing Adjustment
NOTE: Any time a roof opening panel motor is removed, the
cables/mechanisms can experience free-play movement. It is important that the
cables do not move. They are timed to be parallel with each other. If one or
both are moved in either direction, they must be re-timed.
NO ...
